CHECKING ESTIMATES

Specialists of our company are offered estimate verification services   for any kind construction, repair, installation, commissioning   and design and survey   works, regardless of the type of object, whether apartments, houses, offices, enterprises,   and internal and external engineering systems.

Provide reliable security. - It is necessary to disconnect the power source and water supply network in the area. - The cause of the landslide process is eliminated urgently. - an assessment of the state of the construction fund and engineering infrastructure in the area is carried out in relation to endangered lives of residents and, if necessary, the removal of people from the endangered territory is organized. - Organized continuous monitoring of the zone of activated landslide.

SPECIALIZED OFFICES PREPARE PRINCIPLES, ORGANIZE AND AGREE IMPLEMENTATION OF THEM. - leakage of the surface and other impacts from the landslide body; - Implementation of vertical planning, the formation of slopes, slopes, etc. - Implementation of certain types of urgent fortification works - construction retaining wallsspraying plots. - Arrange the displacement of power and communication cables in the area. - Organization of the export of property assets from the district and a ban on people living in it. - Construction of drainage systems to reduce the level of groundwater. - When processes are collapsing in nature, they cause partial collapse, controlled by time, volume and location, to prevent their sudden activation and accidents.

Checking estimates can be carried out in any standards: TSN, FER, TER, HESN, housing and communal services, aircraft,   commercial and general market prices.

  PRICES FOR CHECKING ESTIMATES   in our company an average of 0.2% of the received estimated cost. However, we evaluate our work on checking estimates depending on the complexity and most often the cost may be lower than 0.2%, for more details about our prices, see the PRICES page.

Every year at the end of summer, thunderstorms occur with thunderstorms and hail, which cause significant material damage, and sometimes human casualties. Although there are currently ways to protect against this natural phenomenon, people who work outdoors are at risk.

WHAT TO DO WHEN THE US OFFICE? - If you are in the midst of a thunderstorm, try to stay away from tall trees and lonely rocks. If there is a dry object, sit on it. - If you are outside, do not lie down and do not touch the ground with your hands. Get on your knees as hard as bats. Bend your head and press your knees to your chest. Cross your arms and cover your ankles. Stay away from your neighbor. “If you're on a bike, get out of it.” Do not grab or hold metal objects; they attract thunder.

WORK TIME OF OUR EXPERTS:   on weekdays and WEEKENDS and HOLIDAYS from early morning until late evening, and in case of serious need, even ALL-HOUR!

CALL for pricing estimate documentation   for any kind of work and other questions by phone numbers indicated on the page CONTACTS.

Move away from high voltage power lines. Stay away from metal structures, fences, fences and other metal enclosures. - Deep caves are suitable places for shelter. Stay at least 3 meters from the entrance and try to have at least a meter of free space on both sides. Do not shelter near or over rocky masses. - If a storm surprises you in a river, a pond or pool will immediately come out of the water and leave. In case you are a boat or surfing the sea, you will quickly go ashore. - When you are at home or at work, you must disconnect the TV, cable from an external antenna, computer, VCR and other electrical appliances from the network.

General reference on the topic:

Check estimates.

Cost analysis is a very important part of the contractor-customer interaction process. After all, the process of construction and installation work itself cannot be planned in advance at 100%, and therefore the initial cost indicated in the estimate should also change after changes in the work done. In addition, quite often, unfortunately, the customer (rarely the contractor) pays little attention to checking the budget documentation at the initial stage before starting work (if at all), hoping for the integrity of the contractor or the Russian "maybe". As a result of such carelessness, after some time it turns out that the contractor invoices the customer to pay for its services much more than the amounts that they cost, including a lot of what he did not do and the cost of materials that are much higher than the average market prices.

Close the doors and windows. Stay away from fountains, balcony doors, windows. - Take the car antenna while driving. If there is lightning while driving, check the tires of the car; if they are burnt, they may burst. - Lie on the ground immediately if you feel numbness of body parts as a result of electrical stress. - To protect against direct lightning, lightning rods and lightning rods are built. Periodically check the lightning protection installation of each building. - In the event of hail, seek refuge immediately; large ice cracks can cause injuries and injuries.

The optimal algorithm of the contractor and customer is as follows:

Drawing up a statement of the scope of work, with mandatory approval and approval by the customer and contractor;

Drawing up budget documentation on this sheet by the contractor and submitting it to the customer for approval;

Verification and approval of estimates by the customer;

SUCCESS is not so widespread, but it is a well-known natural phenomenon for some regions of the country. This is an atmospheric whirlwind that moves with great speed. It appears in thunderclouds near the ground, its lower part resembles an inverted funnel. This leads to destruction, human casualties are possible. Strong winds are a frequent occurrence in the country, in some cases at a particularly high speed of air masses, representing a danger to humans and can cause material damage.

NEED TO TAKE THE FOLLOWING MEASURES. - Compliance with building standards to achieve greater building sustainability. - Watch a weather bulletin broadcast on radio and television when there is wind or wind, or an unusually strong wind. As with any natural disaster, if you are at home, turn off the electricity, water and gas. - Do not stay on the street. There is a risk of falling debris of buildings and other objects. Go home and close the doors and windows tightly. Windshield usually affects roof structures and upper floors.

Acceptance of work by the customer in accordance with the bill of quantities and estimates (if necessary, estimates are adjusted) based on the Act on acceptance of work performed in the form of KS-2;

Payment for work performed according to the certificate of cost of work performed in the form of KS-3.

The judge and, if necessary, use the basement for the building as a shelter. - If you are away from home, go to a public building, metro, find a safe haven. - If you find yourself on the road, stop the car in an open area, away from power lines, trees and overhanging stones. Seek refuge. - If you are on a field or in the mountains, take low places and damage to pass the danger.

ANIMALS, SHOES AND LOVE. ANIMALS AND SHOES are commonplace in our country. They are typical for December and January, but can be seen during the remainder of the winter months. Snowstorms and ice conditions lead to the destruction of air traffic, blocking roads and, possibly, bringing many people to risk. SHOULD TAKE THE FOLLOWING PROTECTIVE MEASURES. - It is necessary to monitor the weather broadcast on radio and television, and if this is not absolutely necessary, postpone the trip, some of the roads will be closed due to windings. - If you need to go, it is best to travel by train.

Checking the estimates (analysis of estimates) at the initial stage before starting work will significantly reduce the expenditure of funds (any contractor pays a minimum of 30% overpricing for their services). Verification (analysis) of budget documentation (which may change) during the work process will eliminate unnecessary over-expenditure of funds for the purchase of additional materials and unnecessary work. Even in the most neglected case, when estimates were not drawn up and were not checked at all, checking the estimates can significantly save money by sequentially restoring the entire process of work from scratch, but it is much more difficult in terms of labor and will have to say goodbye to some money (for services on production of control measurements, part of the overestimation of the volume of work that is already impossible to verify, etc.).

Put on warm clothes and appropriate shoes, put water and a few sandwiches in your wallet. - If you decide to go by car, make sure that you have enough fuel, rope, a blade, a flashlight and an ax. Tires should not be too high, install chains. - Choose first-class roads, even if you travel more miles, they are cleared of privileged trips. Drive slowly and be careful when walking past buildings, power lines, and trees. - Observe the temporary markings set by the controls and the road services. - If you encounter cluttered cars on the road, mark the place and notify the Traffic Police, Road Services or the Main Directorate of Fire Safety and Protection of the Ministry of Internal Affairs - the Ministry of the Interior. - If you are mired in snow, avoid starting the engine in standby mode because of the danger of poisoning, periodically turn it off.

Thus, checking the estimate will save you from many unpleasant surprises, such as:

Overestimation of the volume of work performed;

Exclusion of the cost of works that are not actually done (for example, hidden work);

Exclusion of duplicate quotations and works;

Overpricing of materials and equipment, etc.

In accordance with the foregoing, one important conclusion can be made: the sooner the customer (or contractor) starts checking the estimates himself or entrusts checking the estimates professional estimate engineers, the more he will save money and time. Thus, the analysis of estimates for construction and installation works will allow the most optimal use of material resources.

Attach clothing to the antenna to be noticed. - Help those in trouble. Frozen parts of the body are wiped with alcohol and gently massaged. Do not rub snow - the skin cools further and the skin can be damaged. If the situation worsens, stop the trip by stopping in the nearest city. - When you need to walk from one place to another, equip yourself with appropriate shoes and warm clothes. Avoid moving separately, away from buildings, power lines, poles and trees, act against freezing limbs. - Take medicine and a thermos with tea or other warm and sweetened drinks. - In settlements, contact the administrative authorities, specialized bodies of the Ministry of the Interior or road services.

Estimates and budget documentation are very important documents, which is why their preparation and preparation should be treated with all responsibility and seriousness. Indeed, in cases of correctness, in the future, problems can be avoided, since both the selection of material and all the work that is necessary for the implementation of the project will be carried out correctly.

Follow the instructions of the General Directorate of Fire Safety and Public Protection on the radio. Lavinia Lavins is the most serious hazard in the highlands. They are most often found on slopes with a certain slope and uneven surface. They resemble a giant waterfall, and the snow speed can exceed 300 kilometers. in an hour. An avalanche wave of snow is able to sweep everything in its path. THE GORN NEEDS TO MEET SOME BASIC REQUIREMENTS :. - Before traveling to the mountain, it is necessary to collect information about the state of the snow cover, especially about the wind.

TERM OF CHECKING THE ESTIMATES FROM 1 DAY!

Most often, they turn to us to check estimates and adjust them, as a rule, when the estimate has already gone somewhere to check and “failed”. Most often, the following points are subject to verification:

Osmeta offers its customers a service such as checking estimates and estimates. Thanks to professional verification of estimates, you can understand all the issues related to the construction, or repair, of premises. Check how rationally the budget allocated for the construction (repair) is spent.

Familiarity with the weather and predictions is a must. If the chance of an avalanche is likely to delay the trip. - The fog most likely falls into an avalanche, even in places where it can be avoided at a clear time. - Go on a march with an experienced climber. The team leader must report the exact route to relatives, tourists and the Mountain Rescue Service. Going out of the mountain alone is equal to suicide. Even the slightest misfortune can lead to death. Do not show excessive courage. The behavior of the group must comply with safety rules. - Follow the instructions of the team leader and discipline.

WE HAVE LOW PRICES. THE COST OF CHECKING THE ESTIMATES DEPENDS ONLY ON WORK!

Verification of budget documentation is the most important function of construction control. Very often, contractors inflate price requests, thereby causing significant damage and reduce the effectiveness of the funds that were invested in the construction (repair) of the premises. This check can be carried out at different stages of the project. And at the very beginning, and already in the process.

He evaluates the conditions and makes decisions that are binding on everyone. - If there is any doubt that you are in the avalanche zone, change the route or return to the exit point in time. - Each member of the group chooses clothes, shoes, an avalanche, skis and poles that can be used when an avalanche occurs. - It is necessary to wear additional clothing that can help with possible wetting or hypothermia of the body.

Monitoring and supervision of the construction process is one of the key activities that precede the successful completion and commissioning of each project. Our company offers full technical supervision of the investor during construction. The services that we provide to our customers are control over the implementation of construction work and technological procedures in accordance with design documentation   and all technical conditions and standards, control and coordination of the bill of lading of the general contractor, compliance of the design with environmental aspects and, no less important, labor and health protection in the workplace.

What errors can most often be found in the estimate documentation? Here, everything is very simple:

  • significant overstatement of materials;
  • accordingly, overstatement of work;
  • the wrong amount of work, in this case, you need to re-count everything on the project;
  • various errors associated with the use of prices, coefficients, indices.

OPERATIONAL DEPARTURE TO THE CUSTOMER'S OBJECT!

We are always ready to adapt our services to the specific needs of our client.







Project management and project management Preparation of a study on construction and a feasibility study Coordination of urban research and the work of the general designer Designing a financing and co-financing model Estimating costs and incomes Assessing the project economy Concepts for evaluating and selling Construction control and supervision, cost control Preparation of a restoration system and recycling concepts. Project management is designed as a group management capable of quickly and flexibly making decisions.

This is not surprising, because the general contractor is interested in profit and, of course, wants to complete the facility, for the benefit of himself. In order to maximize profits, subcontractors and general contractors, in the course of work, go to various tricks.

Alas, not every customer will be able to discern with the naked eye the fact that many costs are significantly overstated. After all, the estimated department of the general contractor does not cost anything, for example, to overstate the cost of materials, or transport. There are so many different tricks. Not having much experience in construction, it is not possible to independently verify the estimate documentation.

That is why, in order to save the construction budget from “swelling”, it is best to turn to specialists and professionals who, at an affordable price, will check the estimated documentation, analyze it, and save your nerves, time and, most importantly, significantly save the budget!